- The five-level parking deck gives more than 1,400 spaces and each level is approximately 130,000 square feet.
Contractor
Lithko Contracting Inc.
Field Service
PERI Mansfield
Location
The Project
Impressions from the project process
Frame-connected, lightweight MULTIPROP shores, used as shoring towers, provide support in the high bay areas of the parking deck.
PERI’s MULTIPROP aluminum slab props and shoring towers can be easily adjusted to accommodate field requirements.
Standard rental components are used to form the beams and support the GARAGEDECK slab tables.
With the GARAGEDECK system, pre-assembled beam forms are set first to create a grid, which is then filled in as the slab formwork is set in place.
Frame-connected, lightweight MULTIPROP shores, used as shoring towers, provide support in the high bay areas of the parking deck.
PERI’s MULTIPROP aluminum slab props and shoring towers can be easily adjusted to accommodate field requirements.
Standard rental components are used to form the beams and support the GARAGEDECK slab tables.
With the GARAGEDECK system, pre-assembled beam forms are set first to create a grid, which is then filled in as the slab formwork is set in place.
Project Information
Chris Clare
Superintendent
PERI GARAGEDECK systems allow Lithko teams to beat important project milestones. The system’s beam and slab tables are easy to construct and set in place using detailed PERI assembly/arrange- ment drawings. The different aspects of PERI’s system help Lithko build parking garages efficiently and in a safe manner.