        Walcrest Water Reclamation Facility 
            Walcrest, Dallas, TX, United States
         Demand for water in Dallas has grown substantially since Walcrest was first constructed. As such, this facility has played a crucial role in the development and maturing of the Walcrest area of Dallas. It is part of a larger unified network of pump stations and water treatment plants that serves approximately 850,000 residents. With the updates, the new pumps will operate approximately 30% more efficiently than the existing pumps.
General Contractor Webber LLC decided to self-perform the concrete work using PERI shoring for the construction of the new facility, after not being satisfied with a competing system used in previous stages of the project by a subcontractor.
Contractor
             Webber LLC
            Location
           
           
          The Project
        Impressions from the project process
       
      
          PERI UP Shoring Towers make quick work of the concrete slab at Walcrest Water Reclamation Facility, Dallas, TX
         
        
          The crews are building the PERI UP Shoring Towers before flying on the tables
         
        
          PERI UP Shoring Towers are fast to assemble and can be moved without a crane
         
        
          After the tables are attached they stay with the shoring towers for the rest of the project
         
        
          The design called for special towers for the column capitals
         
        
          The towers were moved by hand on the jobsite using removable castors
         
        
          TRIO was used to for the 32 foot tall walls. Panels were ganged on the ground and flown into place at full height
         
         
              
             
              
             
              
             
              
             
              
             
              
             
              
             
             
            PERI UP Shoring Towers make quick work of the concrete slab at Walcrest Water Reclamation Facility, Dallas, TX
           
           
             
            The crews are building the PERI UP Shoring Towers before flying on the tables
           
           
             
            PERI UP Shoring Towers are fast to assemble and can be moved without a crane
           
           
             
            After the tables are attached they stay with the shoring towers for the rest of the project
           
           
             
            The design called for special towers for the column capitals
           
           
             
            The towers were moved by hand on the jobsite using removable castors
           
           
             
            TRIO was used to for the 32 foot tall walls. Panels were ganged on the ground and flown into place at full height
           