Transbay Block 6, San Francisco, CA

Project data

Location: San Francisco, United States

The new 34 story tower will feature 556 residential units in California’s most densely settled large city, also known as the city by the bay, San Francisco. To ensure rapid and efficient progress of the project, PERI delivered the wall formwork system VARIO GT 24 and the RCS S rail climbing systems preassembled to the jobsite. The system in turn ads to the efficiency, by allowing for the inside core walls to be set and aligned prior to the slab pour, so that the core walls can be poured right after the slab pour is complete. Typical story heights of 8’- 5” are achieved in 7 day cycle times. In addition to the core system, PERI also supplies engineering and on-site support, to ensure efficient, optimized and trouble-free operations.

Requirements

  • Preassembled delivery of VARIO GT 24 Wall Formwork and RCS S Rail Climbing System
  • 7 Day Cycle Time
  • Engineering and site service support

Customer

Webcor Builders, San Francisco

Customer's benefit

  • PERI's solution allowed for the inside core walls to be set and aligned prior to the slab pour, so that the core walls could be poured right after the slab pour was complete
  • Preassembled delivery of materials to the jobsite
Daniel Ravano
Superintendent

“The PERI Corewall System worked very well on our project in terms of safety and efficiency. The knowledge and customer service PERI offered was second to none.”

PERI solution

  • Engineered solution that would allow inside core walls to be set and aligned before slab pour