Fruitdale Station, San Jose, CA

Project data

Location: San Jose, United States

For the construction of a one story podium for an apartment building, first time SKYDECK users Jos. J. Albanese chose PERI due to their requirement for an easy, fast, lightweight handset slab formwork system. With SKYDECK components being made of aluminum and no component weighing more than 33 lbs, the system allows for rapid forming, while the drophead enables early stripping of the panels with the shores remaining in place. The contractor rented 41,600 ft² of SKYDECK to pour approximately 80,000 ft² in four pouring segments and achieves two way slab soffit slopes of up to 6“ in 14‘. The continuous thread of the light-weight MULTIPROP posts enables the client to grade the shoring off of the sloped slab on grade.

Requirements

  • Lightweight handset slab formwork system
  • Early stripping of panels for re-use on next level

Customer

JJ Albanese

Customer's benefit

  • Lightweight panels and beams each weighing less than 35 lbs allowed for fast and easy setting of the formwork by hand
  • SKYDECK drophead allows for early stripping and re-use of the panels on next level while props remain in place for reshoring
Jimmy Soto
General Foreman

“We love the system. It’s fast, safe and less wear and tear on the body.”

PERI solution

  • PERI SKYDECK

PERI systems in use