The A52 Clifton Bridge, a major National Highways upgrade project in Nottingham, is a complex structure, which required repairs inside and underneath the bridge to strengthen the concrete.

PERI UP & Infrastructure

Build faster when two systems work as one. Our PERI UP scaffolding range integrates with our core infrastructure components to create the right solution for your project. Whether it’s mobile access inside one of London’s busiest underground stations or a stair tower suspended from a tunnel formwork carriage, combining these two systems creates a wide range of possibilities. 

Our Projects

Seattle, WA Aquarium
The strong hydraulics and climbing brackets allow the ACS Core 400 system to climb the core. The single stroke cylinder enables fast climbing.
Capitol Hill Station, Seattle, USA - The VARIOKIT formwork carriage and HD 200 heavy-duty props were used for the construction of the new subway station in Seattle.
lax apm
broad museum cover
Pegasus Sculpture, USA - The 33 m high and 60 m long sculpture ensemble, featuring Pegasus and a dragon, was realised in a larger than life size. With the help of the PERI UP solution, more than 1,000 bronze castings could be assembled and welded on site.
Providing internal parking was a key element in the creation of a pedestrian-oriented atmosphere for this high-density mixed-use apartment
project in the center of San Diego.
The Ironton Russel Bridge replacement marks the highest span in Ohio
The expansive wave-shaped skylight being erected over what was formerly the mail sorting room of New York’s historic James A. Farley Post Office is perhaps the single most eye-catching feature of this $1.6 billion renovation.

Are you working on a project like this?

Call us on +1 410-712-7225 to discuss your requirements further.

Click here