Infrastructure for Tunnelling

Construct with confidence from one end to the other

From innovative temporary works that support shaft construction to accommodating various tunnel geometries, our engineering team has a diverse level of expertise in tunnelling. With the flexible design of our VARIOKIT components, we can provide a solution for any cross-section and casting method.

Our Projects

The project-specific solution for realising the inner lining was based on a moveable supporting structure consisting of system components taken from the VARIOKIT Engineering Construction Kit.
The Des Plaines tunnel will connect directly to the McCook Reservoir and is built to allow stormwater to drain from the city of Chicago
State Route 99 Tunnel, United States of America