Smithland Hydroelectric Power Plant - The fully assembled units comprising of formwork units and raised formwork are lifted by crane into the concreting position.

Infrastructure for Power & Water

Temporary works that improve your workflow.

Our work in the power and water sector spans from water treatment facilities to renewable energy infrastructure to the UK’s largest nuclear power plant and beyond. Whether it’s single-sided construction or access and climbing formwork for secondary linings, we have the systems that enable you to build seamlessly.

Complex and time-bound

Due to the scale of projects in this sector, construction programmes can span several years. Keeping construction costs and time to a minimum can make all the difference. Involving our team of experts early in the process means we can plan ahead, together. Challenges like space and topography can be factored into the design of our temporary works systems to provide you with the right solution for your project.

  

Our Projects

Blue Lake Dam Expansion in Sitka, Alaska
Marine Oil Terminal 3
The 50-year-old dam was deemed structurally deficient by the Department of Environmental Protection, resulting in draining the lake and relocating the fish to conduct the repairs.
RCSI was commissioned to upgrade the existing Fall Creek Reservoir fish facility to comply with current environmental criteria and build a fish lab to transport native salmon and endangered species.
Crews pouring 21 foot tall concrete wall using TRIO 330 panels, resulting in a neat tie pattern and clean concrete finish
Each tank has an inside diameter of 55‘, with 18“ thick walls that are 34‘ tall.
A complex pour with irregular corners, a slope transition, and a wall batter was realized with TRIO.
MULTIPROP shoring towers were stacked 42’ high to support the slab formwork for the digester tank
PERI UP Shoring Towers make quick work of the concrete slab at Walcrest Water Reclamation Facility, Dallas, TX
Smithland Hydroelectric Power Plant - The Smithland hydroelectric power plant is equipped with 3 turbines; due to the extremely tight construction schedule, all three tubes with their constantly changing cross-sections are being realized at the same time.
VARIOKIT is a construction kit primarily comprised of rentable 5” and 8” double C-channel steel members and adjustable spindles for various formwork applications
The PERI integrated scaffold program increases safety, predictability and efficiency on large industrial sites by providing planning and monitoring software as well as one of the safest and most efficient scaffolding products on the market
LNG liquid gas reservoirs, Cameron, USA - In the US state of Louisiana, three enormous liquid gas tanks were simultaneously realized using PERI know-how. Each of the structures has an 80 m diameter and a wall height of 44 m.
Swiss Krono is one of the world’s largest producers of engineered wood products, especially laminate flooring. The subcontractor supplying the scaffolding for the US expansion selected the PERI UP Rosett Flex modular scaffolding system for the project, in part due to its optimal adaptability, high level of worker safety, and fast assembly.
Bagnell Dam
RUNDFLEX was used to form the round walls of the digester tanks and 42' tall stacked MULTIPROP were used to support the slab formwork.