Applications
Overview
We work closely collaborating throughout the whole construction process in all phases of your project.
more
Search results for (No search results for )
You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.
bridge connection as part of the Industrial Ring Road IRR over the Chao Phraya river, motorway junctions lie in the middle
TNNS Joint Venture:
Taisei, Nishimatsu, NKK, Sino Thai
The PERI formwork solution made a substantial contribution to the successful realisation of this project. The formwork adapted superbly to the changing cross-sections and different inclinations. High work-rate was achieved as a result of the safe and convenient work processes provided by the PERI ACS self-climbing formwork.