I-275 Widening Project (Section 7 Phase 1)
Tampa, FL,
United States
The project improves the I-275 Corridor from the 1-4/I-275 Interchange to North of Hillsborough Avenue to improve capacity, improve safety, and add sound barriers for nearby residential areas. The corridor will add one travel lane in each direction and see a widening of shoulders to accommodate Regional Rapid Transit. There are eight different overpass bridges to widen over intersections. There will also be pedestrian and bike enhancement at intersections for better pedestrian connectivity in the area.
Customer
Lane Construction
Location
The Project
Impressions from the project process
Perspective under the bridge to be widened with additional hammerhead caps adjacent to the existing bridge.
One of the two sides of the dancefloor has been removed. To save labor, it is important to dismantle the least amount of material possible.
The dancefloor is being reassembled at the next location. The scaffold brackets and deck boards were removed to fit the unit on a legal flatbed haul truck and can be replaced in minutes by the crew.
Crews install the column bracket which will support the work platform and new concrete loads of the hammerhead cap.
Perspective under the bridge to be widened with additional hammerhead caps adjacent to the existing bridge.
One of the two sides of the dancefloor has been removed. To save labor, it is important to dismantle the least amount of material possible.
The dancefloor is being reassembled at the next location. The scaffold brackets and deck boards were removed to fit the unit on a legal flatbed haul truck and can be replaced in minutes by the crew.
Crews install the column bracket which will support the work platform and new concrete loads of the hammerhead cap.