500 West Trade, Charlotte, NC

Project data

Location: Charlotte, NC, United States

A 14-story residential tower is being erect in downtown Charlotte at 500 West Trade, will redefine the city skyline, and deliver the ultimate living experience with a rooftop pool, fitness center, theatre room, indoor pet play space, and game room. The 14,000 square-foot tower is surrounded by a 3-story, 80,000 square foot podium garage.  

Lithko selected over 14,000 square feet of PD 5 frame system for the first elevated deck due to the tall clear height and lack of slab on grade. With tight laydown areas on the project, the lightweight system allows for easy vertical tower erection with faster and safer production. 

Levels 3 through 14 are formed using SKYTABLE and UNIPORTAL, taking advantage of the system’s simple stripping and repositioning capabilities to meet the project’s aggressive schedule. 
 

Requirements

  • A lack of slab on grade and tight laydown areas required flexible solutions
  • Quick cycling times due to aggressive project timeline

 

Customer

Lithko Contracting, LLC

Customer's benefit

  • Flexible and fast cycling of large slab areas with SKYTABLE and UNIPORTAL
  • Lightweight shoring for fast and efficient production
Kenny Graff
Project Manager

PD5 is easier to handle and safer because it is lighter. It fits for a lot of different scenarios in concrete construction. The equipment is some of the best on the market.

PERI solution

  • PD 5 lightweight shoring system with minimal components 
  • SKYTABLE’s integrated truss structure makes stripping the tables a simple operation once the slab has set. 
  • UNIPORTAL tables for the cantilevers