1200 S. Figueroa, Los Angeles, CA

Project data

Location: Los Angeles, CA, United States

The two 34-story residential towers being erected in downtown Los Angeles at 1200 South Figueroa, directly across from Staples Center, will provide 648 high-end residential condominiums and more than 50,000 ft2 of ground level retail space in an eight-level podium.

Requirements

Using PERI swivel tables for the perimeter deck shoring is allowing Largo Concrete personnel to quickly and safely cycle forms with the PERI Lifting Fork, while the PERI GRIDFLEX Shoring System provides an easy infill system for the deck shoring. The swivel tables employ custom handrails that exceed the California OSHA standards to meet the high safety requirements of the general contractor, Lendlease Corp.

PERI LPS Lightweight Climbing Enclosure was added on the east side of the building as protection for patrons of the Metrolink station below. Furnished complete with hydraulic lifting accessories, the LPS Screen uses higher standard mesh screens, plywood flaps, and rubber gaskets to again meet the general contractor’s increased safety requirements. Throughout the project, partnering with PERI has enabled Largo Concrete to leverage the experience and expertise of both firms to meet the general contractor’s high requirements for safety based on its history of successful projects in the New York market.

Customer

Largo Concrete Inc.

Customer's benefit

  • Flexible and easy climbing perimeter protection solution with LPS to secure the edge above the train station
  • Lightweight slab formwork GRIDFLEX panels made shoring fast and efficient with free choice of plywood
  • UNIPORTAL tables allows large cantilevers and accomodates any building geometry
Loay Hanthel
Engineering Manager

Working with the PERI Engineering Team, Largo Concrete Inc. was able to create a ‘project-specific’ solution to hand-set formwork on the perimeter edge of 1200 South Figueroa towers utilizing the PERI LPS Screen as an alternate method of protecting the perimeter areas of the typical tower floors.

PERI solution

  • LPS light protection screen to secure the perimeter above the train station
  • GRIDFLEX lightweight slab formwork as the shoring system
  • UNIPORTAL tables for the cantilevers and round edges