Fabrication as immersed-type tunnel with 5 tunnel elements of a length of 100 m each, ramp sections in open, partly monolithic construction.
Limerick Southern Ring Road DirectRoute (Limerick) Construction Ltd.;
Strabag International GmbH, Linz, Austria (concreting and installation work)
PERI offered us the best technical design and the most cost-effective solution. What we were able to achieve with the formwork carriage was more than satisfying. This helped us to pour the segments in a weekly cycle. What qualifies PERI even more is the fact that the technical support was always able to provide us with the right solution in case of questions of detail.