Location: Sør-Fron (Oppland), Norway
JV Harpe Bru ANS
Porr Infrastructure Polska; Implenia Norge AS
The chosen solution of using VBC Balanced Cantilevered Carriages proved itself to be correct. Thanks to the high flexibility of the system, we could optimize our project so that the workload necessary to pour each segment was as short as possible. It also had a measurable influence on the assumed schedule.