Two 46-story residential towers are now being constructed in the Century City section of Los Angeles alongside the Fairmont Century Plaza Hotel. Complementing the recently refurbished iconic crescent-shaped structure, the new glass towers will add approximately 300 elegant condominium homes to the area.
Contractor
Largo Concrete, Inc.
Location
The Project
Impressions from the project process
Using an ACS 400 on each of the two tower cores greatly reduced demands on the cranes.
The working platform can be integrated when using PERI VARIODECK tables at the slab edge.
The flexibility PERI VARIOKIT shoring is an ideal match for use with PERI VARIODECK slab tables.
The towers, which are being built at the same time, have hexagon-shaped cores. For each of the cores, the contractor is using a PERI ACS Core 400 self-climbing interior system with gantry beams suspending the exterior formwork.
Screens that work with PERI’s RCS Rail Climbing System enclose the upper floors as they are being constructed and provide enhanced safety on the site.
Two 46-story residential towers are being constructed at the same time using PERI's ACS Core 400.
Using an ACS 400 on each of the two tower cores greatly reduced demands on the cranes.
The working platform can be integrated when using PERI VARIODECK tables at the slab edge.
The flexibility PERI VARIOKIT shoring is an ideal match for use with PERI VARIODECK slab tables.
The towers, which are being built at the same time, have hexagon-shaped cores. For each of the cores, the contractor is using a PERI ACS Core 400 self-climbing interior system with gantry beams suspending the exterior formwork.
Screens that work with PERI’s RCS Rail Climbing System enclose the upper floors as they are being constructed and provide enhanced safety on the site.
Two 46-story residential towers are being constructed at the same time using PERI's ACS Core 400.
Project Information
Kris Brattain
Tower Superintendent
The PERI ACS 400 is a very simple, smooth-running system, and the PERI field crews are great. Assembling the first six-sided climber was a challenge for all of us, but the second then went together quickly and easily. I’m very happy with how simple it is in use.
Are you working on a project like this?
Contact us to discuss your requirements further.