PERI Formwork Systems, Inc., Projects

PERI Systems In Use

UNIPORTAL Tableforms

´The Edge´ residential structure, West Palm Beach, Florida, USA

The Edge, Residential Structure, West Palm Beach, Florida

Faced with a demanding schedule and high quality concrete finish requirements on the exposed ceilings, Pate worked in conjunction with PERI Orlando to develop a comprehensive formwork concept for this project.
Westgate Condominiums, Calgary, Alberta

Westgate Condominiums, Calgary, Alberta

In order to produce the level of finish required for this building, Elite Formwork Inc. used the KG Climbing Bracket along with an extension for the finishing platform. Using this system allowed the contractor to perform the required finish ...
Chocolate Condominiums, Calgary, Alberta

Chocolate Condominiums, Calgary, Alberta

Elite Formwork Inc. decided to use the PERI UNIPORTAL table system. By using this system, tables ranging in size from 16 ft x 26 ft (4.80 m x 8.00 m) were effectively flown by using the self leveling C-Hook.
PERI Offers Complete Service And Solution

Dell Childrenā€˜s Medical Center of Central Texas, Austin, TX

Utilizing the PERI MULTIPROP allowed the client to achieve various floor heights without the need for replacing shores proving to be advantageous in achieving their schedule.
Using the TRIO column system the various column sizes throughout this project were formed without difficulty.

Scottsdale Waterfront Residences, Scottsdale, AZ

For this project, PERI Formwork Systems supplied over 65,000 ft² (6,000 m²) of SKYDECK slab formwork system.
 Page:  2