PERI Formwork Systems, Inc., Projects

PERI Systems In Use

ACS P Self Climbing System

Bellevue Towers, Bellevue, Washington, USA

With a comprehensive formwork solution from PERI, Hoffman Construction was able to complete a floor in each tower every six days.

Minto Midtown, Toronto, Ontario

Resform Construction is using PERI forms exclusively on this concrete project. TRIO panels are used for both walls and columns throughout the building.
Incorporating PERI’s know-how on this project enabled James McHugh to keep schedule a priority. The main placing boom located in the middle of the floor was designed to be carried by the Automatic Climbing System, eliminating the extra crane time needed to move the system separately.

The Regatta, Chicago, Illinois

The Lakeshore East development area in Chicago is a 26 acre parcel of land located on the South bank of the Chicago River at Lake Michigan. This area will be a host to over 25 new structures in the next few years.
Broadway 655, San Diego, CA

Broadway 655, San Diego, CA, USA

Broadway 655 is the first office tower built in downtown San Diego in 12 years.
During construction of the 7 World Trade Centre, the steel lattice construction for the creation of the building´s core is positioned in advance. With crane-independent climbing platforms in the core shafts, external formwork which is lifted by means of chain hoists to allow easy reinforcement work and special formwork elements for the area where the steel work and reinforced concrete meet – PERI has provided the contractors with an efficient solution to maintain the extremely tight schedule. (Photo: PERI GmbH, Weissenhorn)

7 World Trade Center, New York, USA

The 7 World Trade Center Tower is the first building to be built at “Ground Zero“ in New York City.
 Page:  2