PERI Formwork Systems, Inc., Projects

PERI Systems In Use

ACS R Self Climbing System

Broadway 655, San Diego, CA

Broadway 655, San Diego, CA, USA

Broadway 655 is the first office tower built in downtown San Diego in 12 years.
PERI’s ACS and SKYDECK Systems Achieve 3 Day Pour Cycle

The Lancaster, Chicago, IL, USA

The Lancaster is another highrise being built in the Lake Shore development area in Chicago, IL.
St. James Condominium Tower, Philadelphia, PA, USA

St. James Condominium Tower, Philadelphia, USA

The St. James Condominium Complex is considered the premier residential high rise facility in the city of Philadelphia.
Cooper River Bridge, Charleston, SC, USA

Arthur Ravenel Jr. Bridge (Cooper River Bridge), Charleston, SC, USA

Two 175 m high piers, at a distance of 472 m from each other, take the loads of this cable stay construction, which connects both sides of the Cooper River.
The world´s highest bridge piers (245 m) will be constructed using PERI formwork and climbing technology. The 2,460 m long motorway viaduct near Millau in south France is the area upon which this construction will take place. (Photo: PERI GmbH)

“Viaduc de Millau” Motorway Bridge, France

This very spectacular bridge project in southwest France was designed by the English architect, Sir Norman Foster.
 Page:  2