The $50 million 16 story building is primarily a steel structure but, for security reasons, contained a thickened concrete blast wall around its North and West perimeter.
|
|
Work began in December 2006 on the $240 million expansion to the Potowatomi Casino in downtown Milwaukee. Using SKYDECK, the contractor broke the floorplan of 130,000 ft² (12,000 m²) into ten approximately equal pours.
|
|
Construction of the five concrete core and shear walls for the 14 story expansion to the Milwaukee Children’s Hospital was accomplished using TRIO panelized wall formwork and KGF clim-bing units.
|
|
General contractor Armada Hoffler Construction awarded Century Concrete with building the 39 story Westin Hotel & Residences as part of a $500 million downtown development called “The Town Center”.
|
|
The 8 level 300,000 ft² (27,900 m²) building is located on a 2 acre city block and consists of 5 hotel floors and 2 two condominium levels.
|