Construction of the 55 West on the Esplanade in downtown Orlando began in
mid-2005. The project is a 35 story mixed use commercial / residential tower adjacent to a 12 story parking garage.
|
|
With a comprehensive formwork solution from PERI, Hoffman Construction was able to complete a floor in each tower every six days.
|
|
At 46 stories and 456 ft (139 m) tall, the distinctive blue glass Grand & Kingsbury residential complex stands out in the River North area of Chicago because of the relative lack of skyscrapers nearby.
|
|
Resform Construction is using PERI forms exclusively on this concrete project. TRIO panels are used for both walls and columns throughout the building.
|
|
Madison Concrete Construction chose the ACS (Automatic Climbing System) for the massive 48 ft by 120 ft (14.60 m by 36.60 m) concrete core being built ahead of the surrounding steel structure.
|