|
The George A. Roberts Engineering Hall on the campus of Carnegie Mellon University is built into a steep hillside with the three exposed sides featuring five stories of architecturally exposed cast-in-place exterior walls.��
|
|
The construction of Seneca College proved to be a schedule driven project.
|
|
The Overture Center is a $ 200 Million Dollar effort to create an arts district in the heart of Madison, WI.
|
|
PERI received the order to deliver 38,000 sqft (3,530 m²) of equipment to the Omaha Convention Center with the expectation that it would arrive the next day.
|
|
To form the Concession Stand walls, 12'' high x 8'' wide (3.66 x 2.44 m) RUNDFLEX gangs were shipped to the jobsite, where the 8'' high x 8'' wide (2.44 x 2.44 m) gangs, from the retaining walls, were then attached on top creating a form 20'' ...
|