S&F Concrete of Hudson, MA is constructing Boston´s new World Trade Center.
|
|
Recently, they took the lead once more by being the first to use the PERI MULTIFLEX Flying Table System for their project on Long Island, at the State University of New York at Stony Brook.
|
|
The Bracebridge Center III project in downtown Wilmington, DE is a part of a multimillion Dollar expansion of the national headquarters for MBNA.
|
|
The Fountain Square West project, underway in downtown Cincinnati, is a five story department store with 70,000 sqft (6,500 sqm) of 24" (61 cm) deep positioned beams and 5" (12.70 cm) slab per floor.
|
|
The Beachwood Place Parking Garage is a 230,000 sqft (21,400 sqm) one level post-tensioned 9" (23 cm) slab with a clear story height which varied from 12'-3" (3.73 m) to 17'-0" (5.18 m).��
|