The steel arch bridge was sand blasted then repainted, with repairs to the underside of the concrete bridge deck. This required working platforms to follow the arch profile, around struts and within working distance of the deck soffitt.
|
|
A 4,500 m² working platform was constructed to assemble the 3-D steel truss roof of the new sports hall in Aarhus.
|
|
Tight fitting working platforms can be constructed using PERI UP Rosett.
|
|
One of the advantages of the PERI UP scaffolding kit can be seen with suspended scaffolds.
|
|
For the renovation and insulation of the 51.00 m high hotel complex the erection of the facade scaffold was not possible off the low level roofs.��
|