|
Jacobsmeyer Mauldin Construction is the concrete subcontractor for this project and chose PERI for their formwork needs based on previous experience.
|
|
St. Louis native McCarthy Construction Co. is currently maintaining an aggressive construction schedule with both day and night crews working. All formwork solutions are provided by PERI.
|
|
Faced with a demanding schedule and high quality concrete finish requirements on the exposed ceilings, Pate worked in conjunction with PERI Orlando to develop a comprehensive formwork concept for this project.
|
|
Using the PERI UP scaffold system and the GT 24 girder to allow large spans and create an aesthetically pleasing platform to allow the contractor to work above while business went on as usual for the hotel.
|
|
The PERI modular SKYDECK slab formwork system was chosen for this project as the proven aluminum MULTIPROP was the ideal solution to form these high floors.
|