Faced with a demanding schedule and high quality concrete finish requirements on the exposed ceilings, Pate worked in conjunction with PERI Orlando to develop a comprehensive formwork concept for this project.
|
|
Using the PERI UP scaffold system and the GT 24 girder to allow large spans and create an aesthetically pleasing platform to allow the contractor to work above while business went on as usual for the hotel.
|
|
The PERI modular SKYDECK slab formwork system was chosen for this project as the proven aluminum MULTIPROP was the ideal solution to form these high floors.
|
|
This structure consists of approximately 100,000 ft² (9,290 m²) of slab work and approximately 33,000 ft² (3,065 m²) of beam work per level.
|
|
Utilizing the PERI MULTIPROP allowed the client to achieve various floor heights without the need for replacing shores proving to be advantageous in achieving their schedule.
|