The PERI RCS Rail Climbing Protection Panel was used on the Block 24 tower at Toronto’s Concord City Place.
|
|
PERI supplied 7,200 ft² (669 m²) of UNIPORTAL tableforms and 8,200 ft² (762 m²) of SKYDECK for the typical floors.
|
|
PERI supplied custom steel formwork, which included the window openings and reveals, to construct the cast-in-place architectural concrete facade.
|
|
The construction of his high-rise condominium building started in September 2006. It will be comprised of 42 levels of luxury condominium, 4 mechanical and utility floors, and 3 levels of parking below the ground.
|
|
Construction of the 55 West on the Esplanade in downtown Orlando began in
mid-2005. The project is a 35 story mixed use commercial / residential tower adjacent to a 12 story parking garage.
|