PERI Formwork Systems, Inc., Projects

PERI Systems In Use

SKYDECK Aluminium Panel Slab Formwork

Great Wolf Lodge, Grapevine, Texas

The concrete work on this 8 story, $100 million resort project began in September 2006.

W-Hotel, Phoenix, Arizona

The 8 level 300,000 ft² (27,900 m²) building is located on a 2 acre city block and consists of 5 hotel floors and 2 two condominium levels.

Streamline Condominiums, Las Vegas, Nevada

The 26 level $129 million Streamline Condominium tower began construction in the heart of old town Las Vegas in July 2006.
University of Wisconsin Children's Hospital, Madison, Wisconsin

University of Wisconsin Children's Hospital, Madison, Wisconsin

The three 142 ft (43.30 m) cores of the structure were formed using TRIO, KGF 240 scaffold brackets and BR internal shaft platforms.
Beauxarts Condominiums, Montreal, Quebec

Beauxarts Condominiums, Montreal, Quebec

On this project, PERI supplied the SKYDECK slab formwork system, TRIO wall formwork and KG climbing brakkets.