PERI Formwork Systems, Inc., Projects

PERI Systems In Use

ACS R Self Climbing System

The crane independent ACS was used to cycle the custom steel formwork on the exterior walls to produce an architectural finish. A high level of importance was placed on the quality of finish required on this project. This was achieved through the various PERI products supplied. (Photo: PERI GmbH)

The Grand Plaza, Chicago, IL, USA

With a footprint of 1.7 million sqft (158,000 m²), the twin tower apartment high rise in Chicago´s booming River North neighborhood will occupy an entire city block.
Park Millennium Tower, Chicago, IL

Park Millennium Tower, Chicago, IL, USA

This new mixed-use high rise building in Chicago reaches a total height of 534''9" (163 m) with three stories under ground and 57 stories above ground.
Park Tower, Chicago, USA

Park Tower, Chicago, USA

PERI were commissioned to supply the formwork for the foundations, retaining walls, columns, walls and floor slabs of the Park Tower Project on North Michigan Avenue.
Arlanda Airport Control Tower, Stockholm, Sweden

Arlanda Airport Control Tower, Stockholm, Sweden

The construction of the new, 85 m high control tower, was necessary to monitor over 375,000 take-offs and landings a year.
Swietokrzyski Bridge, Warsaw, Poland

Swietokrzyski Bridge, Warsaw, Poland

PERI UP Rosett provided on the Swietokrzyski bridge a safe working platform for the cable installers.

 Page:  3