Formwork for the two concrete cores which run the full height of the building were climbed using PERI’s ACS (Automatic Climbing System).
|
|
The building‘s architectural concrete exterior features walls, columns and spandrel beams which were all formed with VARIO.
|
|
The $50 million 16 story building is primarily a steel structure but, for security reasons, contained a thickened concrete blast wall around its North and West perimeter.
|
|
Work began in December 2006 on the $240 million expansion to the Potowatomi Casino in downtown Milwaukee. Using SKYDECK, the contractor broke the floorplan of 130,000 ft² (12,000 m²) into ten approximately equal pours.
|
|
Construction of the five concrete core and shear walls for the 14 story expansion to the Milwaukee Children’s Hospital was accomplished using TRIO panelized wall formwork and KGF clim-bing units.
|