Streamline Condominiums, Las Vegas, Nevada The 26 level $129 million Streamline Condominium tower began construction in the heart of old town Las Vegas in July 2006.
University of Wisconsin Children's Hospital, Madison, Wisconsin The three 142 ft (43.30 m) cores of the structure were formed using TRIO, KGF 240 scaffold brackets and BR internal shaft platforms.
Cathedral Parking Structure, Washington DC The typical floor height is 8.5 ft (2.60 m) but shoring can sometimes be almost 16 ft - 18 ft (4.90 m - 5.50 m) in places.
Ninth Street Garage, St. Louis, Missouri Jacobsmeyer Mauldin Construction is the concrete subcontractor for this project and chose PERI for their formwork needs based on previous experience.
Pinnacle Hotel & Casino, St. Louis, Missouri St. Louis native McCarthy Construction Co. is currently maintaining an aggressive construction schedule with both day and night crews working. All formwork solutions are provided by PERI.