PERI Formwork Systems, Inc., Projects - Housing

Housing

The Museum Towers in Cambridge, MA, USA Construction of three concrete residential towers and a garage was accelerated by careful planning, close coordination of contractors and suppliers, and use of lightweight forming systems.
East Side Village Loft, Calgary, AB, Canada This 8 level residential condominium building required the slab to be poured at a height over 15'' - 8" (4.8 m).
Classico Condominiums, Vancouver, BC, Canada The Classico Condominium project consisted of a 38 story residential structure.
Old Allegheny County Jail, Pittsburgh, PA, USA With time and space at a minimum and no possibility to use a crane, Mascaro needed light and easy to handle formwork systems that allowed cost-effective fulfilment of the contractual requirements.
Heritage Brookdale Project, Pittsburgh, PA, USA If high qualities of concrete surfaces are required, RAPID is the right choice. This lightweight aluminum column formwork enables to manufacture flawless concrete finishes in a very cost-effective way.
 Page:  3