PERI Formwork Systems, Inc., Projects - Industrial Structures

Industrial Structures

National Institute of Standards and Technology (NIST), Gaithersburg, MD, USA An advanced measurement laboratory building was recently completed on the NIST Campus in Gaithersburg, MD. The 4-story building took 18 months to complete.
Long-Distance Railway Terminal, Frankfurt, Germany The construction project was the largest construction site in Germany during 1999, apart from the Potsdamer Platz in Berlin.
Power Station Chimney, Piacenza, Italy For producing electrical energy the town of Piacenza invested in a power station plant that will burn waste products.
Water Reservoir, Aprilia, Italy During the construction of this drinking water container of 3,000 m³ capacity, the use of the PERI systems allowed optimum adjustment to the geometry of the building construction.
Offshore Windfarm Middelgrunden, Copenhagen, Denmark To use wind power is seen as an ecologically sensible way of extracting energy. An off-shore plant was constructed for this purpose in the sea, two kilometres away from Copenhagen harbour.