An advanced measurement laboratory building was recently completed on the NIST Campus in Gaithersburg, MD. The 4-story building took 18 months to complete.
|
|
The construction project was the largest construction site in Germany during 1999, apart from the Potsdamer Platz in Berlin.
|
|
For producing electrical energy the town of Piacenza invested in a power station plant that will burn waste products.
|
|
Oppeln power station built three 72 m high circular silos with a diameter of 20 m and a capacity of 50,000 m³.
|
|
During the construction of this drinking water container of 3,000 m³ capacity, the use of the PERI systems allowed optimum adjustment to the geometry of the building construction.
|