PERI Formwork Systems, Inc., Projects

PERI Systems In Use

MULTIPROP Slab prop

Montfort Hospital Expansion Project, Ottawa, Ontario

The 10,000 ft² (930 m²) 7 story West side expansion is formed using SKYDECK in two seperate pours with floor heights ranging from 13 ft - 14 ft (4.00 m - 4.30 m).
´The Edge´ residential structure, West Palm Beach, Florida, USA

The Edge, Residential Structure, West Palm Beach, Florida

Faced with a demanding schedule and high quality concrete finish requirements on the exposed ceilings, Pate worked in conjunction with PERI Orlando to develop a comprehensive formwork concept for this project.
Pre-Assembled Beam Formwork

University of Texas, San Antonio Parking Structure

This structure consists of approximately 100,000 ft² (9,290 m²) of slab work and approximately 33,000 ft² (3,065 m²) of beam work per level.
Utilizing GRV walers, GT 24 and MULTIPROPs, this simple Tunnel System met the required specifications for versatility and high quality of concrete finish.

Montreal Subway Tunnel (Phase S-04), Montreal, Quebec

PERI''s Wide Range of Versatile Equipment Delivers The Best Formwork Solution at Montreal''s new Subway Line Project
National Underground Railroad Freedom Center, Cincinnati, OH

National Underground Railroad Freedom Center, Cincinnati, OH

Cited as one of Cincinnati´s “Nationally Significant Buildings“ the National Underground Railroad Freedom Center was created to comemorate the enslaved fugitives who sought freedom during the 1800´s.
 Page:  1