PERI Formwork Systems, Inc., Projects

PERI Systems In Use

GT 24

Streamline Condominiums, Las Vegas, Nevada

The 26 level $129 million Streamline Condominium tower began construction in the heart of old town Las Vegas in July 2006.
LNG liquid gas tanks, Cameron, USA

LNG liquid gas tanks, Cameron, USA

In the US state of Louisiana, three enormous liquid gas tanks are currently being built at the same time   using a PERI climbing formwork solution.
Pre-Assembled Beam Formwork

University of Texas, San Antonio Parking Structure

This structure consists of approximately 100,000 ft² (9,290 m²) of slab work and approximately 33,000 ft² (3,065 m²) of beam work per level.
St. Luke''s Hospital Parking Ramp, Cedar Rapids, IA

St. Luke''s Hospital Parking Ramp, Cedar Rapids, IA, USA

The St. Luke’s Hospital Parking Ramp was completed by Kleiman Construction in order to accommodate the Nassif Heart Center parking facility.
Matrix-Adex Condominiums, Toronto, ON

Matrix-Adex Condominiums, Toronto, ON, Canada

The Matrix-Adex is the second phase of a multi-phase project to construct 25 Luxury high rise condominiums in downtown Toronto.
 Page:  1