PERI Formwork Systems, Inc., Projects

PERI Systems In Use

MULTIFLEX Girder Slab Formwork

Streamline Condominiums, Las Vegas, Nevada

The 26 level $129 million Streamline Condominium tower began construction in the heart of old town Las Vegas in July 2006.
RAV Tunnel, Vancouver, British Columbia

RAV Tunnel, Vancouver, British Columbia

In preparation for the 2010 Vancouver Winter Olympic Games, a massive $1.4 billion rapid transit system is being constructed to connect Richmond, the Airport and Vancouver (RAV) and handle the large influx of people expected during the event.
Pre-Assembled Beam Formwork

University of Texas, San Antonio Parking Structure

This structure consists of approximately 100,000 ft² (9,290 m²) of slab work and approximately 33,000 ft² (3,065 m²) of beam work per level.
The Shoreham, Chicago, IL

The Shoreham, Chicago, IL, USA

The Shoreham is one of the first two high rises being constructed on the Lake Shore East Development area in downtown Chicago, IL.
UNIPORTAL Tables were supplied to the site pre-assembled. The only requirement for the contractor was to simply connect the MULTIPROP to the table form, thereby again minimizing the space requirement for equipment storage.

1 King Street West, Toronto, ON, Canada

The 51 story residential tower on 1 King Street West in Toronto, Ontario will be a display of engineering achievement along with classic historical design once completed.
 Page:  1