Goreway Station Combined Cycle Thermal Power Plant Project, Brampton, Ontario

A crew consisting of approximately 50 men, worked around the clock setting up over 1,212,542 lbs (552,000 kg) of PERI UP scaffolding to keep up with the demand of over 15 sub trades at this site.
Brantford Water Tower, Brantford, Ontario

Brantford Water Tower, Brantford, Ontario

The 150 ft (45.50 m) tall Brantford Water Reservoir needed to be completely sandblasted and painted within a tight 12 week schedule.
Sheraton Hotel, Toronto, Ontario

Sheraton Hotel, Toronto, Ontario

Using the PERI UP scaffold system and the GT 24 girder to allow large spans and create an aesthetically pleasing platform to allow the contractor to work above while business went on as usual for the hotel.
Molson Indy, Toronto, Ontario

Molson Indy, Toronto, Ontario

PERI has been extremely successful in keeping with the tight schedule and performing as a team from the engineering to the PERI site labour force.
Water Tank Reservoir, Barrie, ON

Water Tank Reservoir, Barrie, ON

The painting of the elevated water tower in Barrie was a challenge for the contractor due to the fact that a large automobile dealership was directly below.