PERI Formwork Systems, Inc., Projects

PERI Systems In Use

SB Brace Frame

The contractor applied a wooden liner on the face of the TRIO panels in order to comply with the architectural requirements.

Montmorency Subway Station, Laval, Quebec

PERI offered the TRIO wall formwork system - with SB Frames for the bottom one-sided walls
National Underground Railroad Freedom Center, Cincinnati, OH

National Underground Railroad Freedom Center, Cincinnati, OH

Cited as one of Cincinnati´s “Nationally Significant Buildings“ the National Underground Railroad Freedom Center was created to comemorate the enslaved fugitives who sought freedom during the 1800´s.
Mrázovka Tunnel, Prague Ring Road, Czech Republic

Mrázovka Tunnel, Prague Ring Road, Czech Republic

The commissioning of the Mrázovka Tunnel, part of the Prague ring road, has greatly relieved the congested road network in the south-west area of the city.
UNIPORTAL Tables were supplied to the site pre-assembled. The only requirement for the contractor was to simply connect the MULTIPROP to the table form, thereby again minimizing the space requirement for equipment storage.

1 King Street West, Toronto, ON, Canada

The 51 story residential tower on 1 King Street West in Toronto, Ontario will be a display of engineering achievement along with classic historical design once completed.
The new TRIO Shaft Element allows for the internal cores to be stripped and reset as a complete unit.

Children''s Mercy Hospital Expansion, Kansas City, MO

PERI’s single sided SB Brace Frame with TRIO wall formwork, KG 240 climbing brackets and the new Shaft Panel 330.