ACS R Self Climbing System

RBC Centre, Toronto, Ontario

The project also features an adjoining 10 story podium structure, which has a typical office floor plate of 37,000 ft² (3,437 m²) and 3 levels of underground parking.

Ninth and Jefferson Building, Seattle, Washington

Formwork for the two concrete cores which run the full height of the building were climbed using PERI’s ACS (Automatic Climbing System).

Trump International Hotel and Tower, Chicago, USA

Located along the Chicago River at the junction of Loop and North Michigan Avenue, the Trump International Hotel and Tower will be the latest skyscraper to rise above the Chicago skyline.
Incorporating the SKYDECK slab formwork system as well as ACS reduced the required crane time.

University Club Tower, Milwaukee, Wisconsin

PERI‘s ACS (Automatic Climbing System) was chosen for this project because Findorff wanted to run the shear walls ahead of the horizontal slabs.
Incorporating PERI’s know-how on this project enabled James McHugh to keep schedule a priority. The main placing boom located in the middle of the floor was designed to be carried by the Automatic Climbing System, eliminating the extra crane time needed to move the system separately.

The Regatta, Chicago, Illinois

The Lakeshore East development area in Chicago is a 26 acre parcel of land located on the South bank of the Chicago River at Lake Michigan. This area will be a host to over 25 new structures in the next few years.