PERI Formwork Systems, Inc., Projects

PERI Systems In Use

VARIO GT 24 Girder Wall Formwork

Ninth and Jefferson Building, Seattle, Washington

Formwork for the two concrete cores which run the full height of the building were climbed using PERI’s ACS (Automatic Climbing System).

Bellevue Towers, Bellevue, Washington, USA

With a comprehensive formwork solution from PERI, Hoffman Construction was able to complete a floor in each tower every six days.
LNG liquid gas tanks, Cameron, USA

LNG liquid gas tanks, Cameron, USA

In the US state of Louisiana, three enormous liquid gas tanks are currently being built at the same time   using a PERI climbing formwork solution.
Phoenix Sky Harbor Control Tower, Phoenix, Arizona

Phoenix Sky Harbor Control Tower, Phoenix, Arizona

PERI was brought on board to supply a forming system that would allow Kiewit to stay on schedule while delivering a superior product.
Incorporating PERI’s know-how on this project enabled James McHugh to keep schedule a priority. The main placing boom located in the middle of the floor was designed to be carried by the Automatic Climbing System, eliminating the extra crane time needed to move the system separately.

The Regatta, Chicago, Illinois

The Lakeshore East development area in Chicago is a 26 acre parcel of land located on the South bank of the Chicago River at Lake Michigan. This area will be a host to over 25 new structures in the next few years.