PERI Formwork Systems, Inc., Projects - Skyscrapers

Skyscrapers

RBC Centre, Toronto, Ontario The project also features an adjoining 10 story podium structure, which has a typical office floor plate of 37,000 ft² (3,437 m²) and 3 levels of underground parking.
Concord City Place, Block 24 LM, Toronto, Ontario The PERI RCS Rail Climbing Protection Panel was used on the Block 24 tower at Toronto’s Concord City Place.
44 Monroe, Phoenix, Arizona PERI supplied 7,200 ft² (669 m²) of UNIPORTAL tableforms and 8,200 ft² (762 m²) of SKYDECK for the typical floors.

Kinzie Station Tower, Chicago, Illinois PERI supplied custom steel formwork, which included the window openings and reveals, to construct the cast-in-place architectural concrete facade.
The Residences at the Ritz-Carlton, Philadelphia, Pennsylvania The construction of his high-rise condominium building started in September 2006. It will be comprised of 42 levels of luxury condominium, 4 mechanical and utility floors, and 3 levels of parking below the ground.
 Page:  1