Cajun Constructors, Inc. of Baton Rouge Louisiana was tasked with the $33.5 million dollar turn-key demolition and replacement of the 4,000 ft (1,219 m) N. Claiborne to Florida Ave. floodwall.
For this project, PERI offered the TRIO modular wall formwork system. Using only one type of connection device, called the BFD, multiple configurations of various panel sizes could be easily connected together.
The West Side Combined Sewer Overflow Project, when completed will collect wastewater from existing sewers and carry it over 4 miles under the Willamette River.