Sheraton Hotel, Toronto, Ontario




PERI’s GT 24 and PERI UP Scaffolding
Keeps Lobby Open During Construction

The lobby renovations at the Sheraton Hotel in downtown Toronto, Canada was a challenge for the PERI scaffold team. The contractor decided to go with PERI because of the look and minimal obstructions due to design. The contractor also had a challenge because while the lobby and front entrance renovations were planned they had to phase the work to allow minimal inconvenience to the hotel guests and employees.

Using the PERI UP scaffold system and the GT 24 girder to allow large spans and create an aesthetically pleasing platform to allow the contractor to work above while business went on as usual for the hotel. PERI provided all labor to install and dismantle all of the PERI UP scaffold in the lobby and in the front entrance. PERI completed the project ahead of schedule due to the engineered PERI UP modular scaffold system.

PERI Systems In Use
  • PERI UP Rosett

  • Scott Gregory


    Superintendent

    “The GT 24 worked well as they allowed my crew to span large distances between shores. The system also allowed me to run two jobs (one above and one below) at the same time which cut my time in half.”

    Contractor: Buttcon Limited, Toronto, ON
    Field Service: PERI Toronto
    Field Service: PERI Formwork Systems, Inc., Canada
    PERI scope 01/2006