Harry Rosen Expansion Project, Toronto, Ontario


Versatile MULTIPROPs
Provide Safe Pedestrian Walkway



PERI designed, supplied and installed MULTIPROPs and GT 24 girders in combination with PERI UP scaffolding components to provide a safe pedestrian walkway for the 2 story expansion of the well known prestigious Harry Rosen Clothiers in Toronto.

A 350 ft (106.80 m) long and 30 ft (9.10 m) high hoarding was designed to provide a 150 lbs (68 kg) PSF public safety barrier, as well as maintain esthetics at the storefront and the surroundings
during construction, which was achieved using the versatile MULTIPROP system in this creative and effective application.

PERI Systems In Use
  • MULTIPROP System
  • Contractor: Vanbots Construction Corp., Toronto, ON
    Field Service: PERI Bolton, ON