|
Molson Indy, Toronto, Ontario
PERI UP Scaffolding Keeps Molson Indy Race on Schedule
The Molson Indy has celebrated 20 amazing years of world-class racing in the city of Toronto. Since 1986, over three million fans have experienced the three-day event making it one of the most anticipated spectator events year after year.
PERI is now into its 4th year of a seven year contract to supply the high end Hospitality Suites. Safety, overall construction and the attention to cosmetic details are the strengths that PERI brings to the table.
PERI has been extremely successful in keeping with the tight schedule and performing as a team from the engineering to the PERI site labour force.
|
| PERI Systems In Use |
PERI UP Rosett
|
|
Jim Tario,
Race Operations
“In 20 years, I have seen a lot of different systems, however, I can say that PERI always gets the job done on time, on budget and with safety in mind.“
|
|
|
|
PERI scope 01/2006
|
|