PERI UP ROSETT site stair towers



Lightweight and quick to erect

PERI UP site stair towers can be erected without bracing as a stand alone tower or attached to the outside of a working scaffold to a height in excess of 90 m.

With only three additional components – staircase unit – stair guardrail – landing panel – this fast and easy to erect stairtower enhances the PERI UP Rosett system. Push - pull ties at 8.00 m vertically fix the tower to the permanent structure.
The 24 kg staircase unit is laid in and is ready for use.