Montreal Subway Tunnel (Phase S-04), Montreal, Quebec
PERI''s Wide Range of Versatile Equipment Delivers The Best Formwork Solution at Montreal''s new Subway Line Project
For the expansion of Montreal''s subway grid, PERI´s engineers designed a system which allowed the contractor to maneuver the formwork through the confined underground space of the tunnel using mostly standard components.
|
| PERI Systems In Use |
GRV Circular Wall Formwork
MULTIPROP Slab prop
|
Luc Vachon, Superintendent: “Using PERI’s formwork on such a confined site, demonstrated the flexibility of the system to maneuver inside the right angled tunnels both very easily and quickly.”
|
|
|
PERI scope 01/2005
|
|