Hyatt Hotel Convention Center, Denver, CO, USA
PERI Provides Versatility, Efficiency, and Safety Needed to Maintain 4-Day Floor Cycle
The new Hyatt covers approximately one city block in downtown Denver.
This concrete building will provide 1,100 rooms with three levels of parking space, bringing the building to a height of over 489 ft (149 m).
The core of this structure was built using a combination of TRIO and RUNDFLEX.
The major advantage of this system was the ability to form a circular wall with a straight wall using only one standard connection device (BFD).
Along with the QUATTRO VARIO column formwork system, J.A. Walker Company was able to form various column dimensions using only one system.
|
| PERI Systems In Use |
KGF 240 / KG 180 Climbing Systems
QUATTRO Column formwork
RUNDFLEX Circular Wall Formwork
TRIO
|
Derrick Walker, Senior Superintendent: “When performance counts, PERI is the right choice. They gave us the versatility, efficiency and safety we needed to maintain our 4-day per floor cycle.”
|
| Contractor: |
J.A. Walker Construction, Denver, CO |
| Field Support: |
PERI Colorado and PERI Fort Worth |
|
Field Service:
|
PERI Formwork Systems, Inc., United States of America
|
|
PERI scope 01/05
|
|