State Place Condominium Project, Chicago, IL
Innovative Box Culvert Solution for Balconies
A major residential development is currently going on in the Southern section of downtown Chicago. The project consists of 4 residential structures, of which there is a 24-story tower and 34- story condominium buildings. A total of 243 condominiums will be finished by the fall of 2004. In order to achieve this aggressive construction schedule, PERI developed a Box Culvert System that would allow both walls and balcony to be poured simultaneously producing an architectural concrete surface. Each unit could be moved by a single crane pick, thereby ensuring efficient cycling time.
|
| PERI Systems In Use |
SKYDECK Aluminum Slab Formwork System
|
Mort Lane, Carpenter Foreman: “I have been working with the PERI systems for over 4 years now. I am especially happy with PERI’s SKYDECK slab formwork system and their solution for the box culverts on this jobsite.”
|
| Contractor: |
James McHugh Construction Co., Chicago, IL |
| Field Support: |
PERI Germany, Weissenhorn / PERI Chicago |
|
Field Service:
|
PERI Formwork Systems, Inc., United States of America
|
|
PERI scope, 01/05
|
|