Forum at Lake Constance, Lindau, Germany
Infinite Combination
Combining Rosett and Frame components in one structure
Facades are normally scaffolded with frame systems so that the fast erection times associated with frames can be achieved. But to span openings or create cantilevers, lattice girders with tube and fittings have to be introduced.
With PERI UP this is not the case. Without planning modular or frame components can be introduced at any stage, time or position.
On the stepped gable PERI UP Rosett was erected on top of T 70, this allowed cantilevered bays to be constructed with node braces.��
|