Route M Bridge, Barnhardt MO, USA



Faster shoring with a simple system MULTIPROP post-shore, GT 24 Girders

The task:
Shoring of a 4-spay-bridge deck using irregular surface beneath the decking.

The solution:
The PERI MULTIPROP is the optimal choice due to the easily adaptable height variations.

In combination with PERI MRK ledger frames as a table system, each leg of the MULTIPROP system carries 13.49 kips (60 kN), even when the spindle is fully extended.

Goodwin was able to save labor costs and the crew especially liked the simplicity of the MULTIPROP system.

Source: PERI Scope 01/1997

PERI Systems In Use
  • MULTIFLEX Girder Slab Formwork
  • MULTIPROP System
  • Contractor: Goodwin Brothers Const.Co. Crystal City, Missouri
    Field Service: PERI Formwork Systems, Inc., United States of America