Overture Center, Madison, WI, USA
PERI Delivers Excellence in Engineering Support
The Overture Center is a $ 200 Million Dollar effort to create an arts district in the heart of Madison, WI.
The acoustical design of the Performance Hall consisted of large structural concrete walls with complex geometry extending approx. 118 ft (36 m). J. H. Findorff and Sons required a formwork system that could cycle laterally around the structure, easily adapting to offsets, corners and pilasters.
Using PERI TRIO and KG climbing system, the walls were cycled effectively in four 16´ (4.88 m) lifts around the perimeter of the structure.
Source: PERI scope 1/2003
|
| PERI Systems In Use |
TRIO
|
| General Contractor: |
J. H. Findorff & Sons Ltd., Madison, WI |
| Field Service: |
PERI Chicago |
|
|