|
25 York Street, Toronto, Ontario
Glass Exterior Facade - No Anchoring to Building
PERI UP Rosett Offers Great Solution
The largest challenge on this project is the installation of a 58’ (17.70 m) free standing access scaffolding structure in order to reach the soffit for siding installation. This support structure can not be anchored to the building itself due to the glass exterior that is being installed. PERI’s scaffolding team is able to accommodate this challenge with a delicate design of a combination of PERI UP systems.
In addition, a PERI UP access scaffold application supports four corners of the building with a typical 60’ (12.30 m) height and various lengths. PERI UP Rosett is designed for multi-trade usage and the flexibility of the system allows ongoing modifications. PERI is involved from the design stage, to installation and dismantle, training, to a continuous quality control program to ensure safety and increased productivity on this project.
|
| PERI Systems In Use |
PERI UP Rosett
|
|
John Neilson
Superintendent
We are very satisfied with the PERI UP system on our job site. It was easy to learn and to teach our staff because all products are marked for simple installation and modification according to the drawings. The PERI crew is competent and offers us excellent service.
|
|
|
|
|